Passaic Avenue Bridge Reconstruction
Sector: Road • Location: Lodi, New Jersey, United States
Source: TAPinto
The Passaic Avenue Bridge in Lodi, NJ, was fully rebuilt and reopened after a $3.8 million project. The new bridge is a 76-foot steel girder span with a reinforced concrete deck, wider travel lanes, shoulders, and ADA-compliant sidewalks. It improves safety, traffic flow, and resilience against flooding, replacing the original bridge that first opened in 1903.
- Status
- Closed
- Sector
- Road, Bridge, Steel, Cement, Government, Metal
- Location
- Lodi, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- TAPinto
ConstructChat
Ask ConstructChat about Passaic Avenue Bridge Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Passaic Avenue Bridge in Lodi, NJ, was fully rebuilt and reopened after a $3.8 million project. The new bridge is a 76-foot steel girder span with a reinforced concrete deck, wider travel lanes, shoulders, and ADA-compliant sidewalks. It improves safety, traffic flow, and resilience against flooding, replacing the original bridge that first opened in 1903. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Lodi |
Source
Source | TAPinto |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Steel, Cement, Government, Metal |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
