logo
ProjectClosed

Passenger Boarding Bridge Replacement

Sector: Bridge • Location: Buffalo, New York, United States of America

Source: Dodge USA

The Work generally consists of furnishing and installing two (2) new or refurbished Passenger Boarding Bridges (PBBs), including furnishing and installing new Pre-Conditioned Air Units (PCAs), furnishing and installing new Ground Power Units (GPUs) and removal/relocation of NFTA supplied PCA (from Gate 8 to storage for use on another project) at the Buffalo Niagara International Airport (BNIA), as

Status
Closed
Sector
Bridge, Road, Power Generation (CCGT), Commercial, Government, Airport
Location
Buffalo, New York, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Passenger Boarding Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Passenger Boarding Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Buffalo, New York, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work generally consists of furnishing and installing two (2) new or refurbished Passenger Boarding Bridges (PBBs), including furnishing and installing new Pre-Conditioned Air Units (PCAs), furnishing and installing new Ground Power Units (GPUs) and removal/relocation of NFTA supplied PCA (from Gate 8 to storage for use on another project) at the Buffalo Niagara International Airport (BNIA), as well as providing pavement marking removal and remarking (gate striping) for each gate in accord...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Buffalo

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Power Generation (CCGT), Commercial, Government, Airport

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project