logo

Passenger Boarding Bridges Refurbish - Phase 2

Sector: Airport • Location: San Diego, California, United States of America

Source: Dodge USA

Project
Gc Bidding

The Work includes the furnishing of labor, materials, equipment, and incidental items for the project Refurbish Passenger Boarding Bridges Phase 2. The Work includes but is not limited to Terminal 2 ( T2 ) limited refurbishment of seventeen (17) existing Thyssen Passenger Boarding Bridges ( PBBs ) and replacement of various existing JBT PBBs Preconditioned Air and Ground Power Units, at San Diego

Status
Under Construction
Sector
Airport, Bridge, Power Generation (CCGT), Road, Government, Commercial, Seaport
Location
San Diego, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Passenger Boarding Bridges Refurbish - Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Passenger Boarding Bridges Refurbish - Phase 2” is an infrastructure initiative in the Airport sector, located in San Diego, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work includes the furnishing of labor, materials, equipment, and incidental items for the project Refurbish Passenger Boarding Bridges Phase 2. The Work includes but is not limited to Terminal 2 ( T2 ) limited refurbishment of seventeen (17) existing Thyssen Passenger Boarding Bridges ( PBBs ) and replacement of various existing JBT PBBs Preconditioned Air and Ground Power Units, at San Diego International Airport.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Diego

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Airport, Bridge, Power Generation (CCGT), Road, Government, Commercial, Seaport

Article published date

2024-07-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project