logo
ProjectBid Results

Passenger Loading Bridge Electrical Unit Price Phase 3

Bid results · Washington · Last reported Apr 2023

Source: Dodge USA

The scope of work includes providing all labor, materials, equipment, tools and incidentals to perform, complete and fin-ish electrical systems associated with. the removal and replacement of airport PLBs at Seattle-Tacoma International Airport. Electrical work includes but is not limited to installations of raceways, wiring, boxes, transformers, 480 VAC disconnect switches, raceways, cabling and

Status
Closed
Sector
Airport, Bridge, Power Generation (CCGT), Telecommunications, Government, Road, Commercial
Location
Seattle, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Passenger Loading Bridge Electrical Unit Price Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Passenger Loading Bridge Electrical Unit Price Phase 3” is an infrastructure initiative in the Airport sector, located in Seattle, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work includes providing all labor, materials, equipment, tools and incidentals to perform, complete and fin-ish electrical systems associated with. the removal and replacement of airport PLBs at Seattle-Tacoma International Airport. Electrical work includes but is not limited to installations of raceways, wiring, boxes, transformers, 480 VAC disconnect switches, raceways, cabling and accessories for 400hz, systems, PLB controls wiring, miscellaneous electrical devices, temporary ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Airport, Bridge, Power Generation (CCGT), Telecommunications, Government, Road, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project