Passover Water Tower Interior Painting
Sector: Water Supply and Storage • Location: Osage Beach, Missouri, United States of America
Source: Dodge USA
The work of this contract includes removal of the existing coating, interior painting of the wet areas and dry coating of the fill and discharge pipes for the Passover Water Tower. Removal work shall include abrasive blasting per the specifications. Paint of the wet areas per the specified coating system. Coating of the dry fill and discharge lines per the specified coating system. Disinfection of
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Osage Beach, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Passover Water Tower Interior Painting
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work of this contract includes removal of the existing coating, interior painting of the wet areas and dry coating of the fill and discharge pipes for the Passover Water Tower. Removal work shall include abrasive blasting per the specifications. Paint of the wet areas per the specified coating system. Coating of the dry fill and discharge lines per the specified coating system. Disinfection of the tank. Additionally, the removal of the existing expansion coupling and installation of a new... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Osage Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
