logo
ProjectPlanned

Path 15 Project

The owner, status and timeline of this project. A free account opens every field.

Source: Utility Dive

The Path 15 project is a 500 kV transmission line that connects the Northern and Southern California transmission grids, owned by Duke American Transmission Company.

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission
Location
California, United States of America
Updated
22 Jul 2026
Source
Utility Dive

ConstructChat

Ask ConstructChat about Path 15 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Path 15 Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in California, United States. Taiyo aggregates data on it from Utility Dive.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Path 15 project is a 500 kV transmission line that connects the Northern and Southern California transmission grids, owned by Duke American Transmission Company.

Original sector

Transmission & Distribution

Location

Country

United States of America (USA)

State

California

Source

Source

Utility Dive

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project