Path Lab Renovations
Sector: Commercial • Location: New Iberia, Louisiana, United States of America
Source: Dodge USA
The project consists of labor, materials, and all work to buildout a Primate Research Lab in a space on the second floor of an existing building. The existing space has the majority of walls, ceilings lights removed in preparation for this renovation. The renovation will include 6,545 square feet of space in Building 27 on the University of Louisiana at Lafayette New Iberia Research Center Campus.
- Status
- Closed
- Sector
- Commercial, Education
- Location
- New Iberia, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Path Lab Renovations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of labor, materials, and all work to buildout a Primate Research Lab in a space on the second floor of an existing building. The existing space has the majority of walls, ceilings lights removed in preparation for this renovation. The renovation will include 6,545 square feet of space in Building 27 on the University of Louisiana at Lafayette New Iberia Research Center Campus. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | New Iberia |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
