Path Two 35kV Cable Replacement Project Construction
Sector: Power Generation (CCGT) • Location: Pasadena, California, United States of America
Source: Dodge
The City of Pasadena is soliciting bids from qualified contractors to provide construction services for the Path Two Cable Replacement Project. The scope of work includes removal of existing underground 35kV subtransmission cable and installation of new City-furnished 1250 KCMIL Triplex cable within existing conduit systems.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The City of Pasadena is soliciting bids from qualified contractors to provide construction services for the Path Two Cable Replacement Project. The scope of work includes removal of existing underground 35kV subtransmission cable and installation of new City-furnished 1250 KCMIL Triplex cable within existing conduit systems. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- TENANT IMPROVEMENT FOR A NAIL SALON, ELECTRICAL, VENT IN BATHROOM
