Path Two 35kV Cable Replacement Project Construction
Sector: Power Transmission • Location: Pasadena, California, United States of America
Source: Dodge
The City of Pasadena is soliciting bids from qualified contractors to provide construction services for the Path Two Cable Replacement Project. The scope of work includes removal of existing underground 35kV subtransmission cable and installation of new City-furnished 1250 KCMIL Triplex cable within existing conduit systems.
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Commercial, Telecommunications, Government
- Location
- Pasadena, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Path Two 35kV Cable Replacement Project Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Pasadena is soliciting bids from qualified contractors to provide construction services for the Path Two Cable Replacement Project. The scope of work includes removal of existing underground 35kV subtransmission cable and installation of new City-furnished 1250 KCMIL Triplex cable within existing conduit systems. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Pasadena |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Commercial, Telecommunications, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
