Path2Zero Cogeneration Facility
The owner, status and timeline of this project. A free account opens every field.
Source: BIC Magazine
Dow's Path2Zero expansion project aims to create the world's first net-zero emissions integrated ethylene cracker and derivatives site with respect to Scope 1 and Scope 2 emissions. The project includes a brownfield installation of a cogeneration facility with integrated post-combustion carbon capture, expected to be operational towards the end of 2030. The facility will produce 3.2 million metric
- Status
- Prospective
- Sector
- Chemical (Industrial), Manufacturing (Industrial)
- Location
- Fort Saskatchewan, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- BIC Magazine
ConstructChat
Ask ConstructChat about Path2Zero Cogeneration Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dow's Path2Zero expansion project aims to create the world's first net-zero emissions integrated ethylene cracker and derivatives site with respect to Scope 1 and Scope 2 emissions. The project includes a brownfield installation of a cogeneration facility with integrated post-combustion carbon capture, expected to be operational towards the end of 2030. The facility will produce 3.2 million metric tonnes of certified low- to zero-carbon polyethylene and derivatives annually, supporting Dow's customers and partners worldwide. |
Original sector | Energy |
Location
Country | Canada |
State | Alberta |
City | Fort Saskatchewan |
Source
Source | BIC Magazine |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Manufacturing (Industrial) |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in Canada
- Voisey's Bay Civil Works
- Brandon - Diesel Exhaust Fluid - Bulk Tank Filling Station
- Henvey Inlet Wind Power Project Ontario
- Niagara Health System
- Port Hardy Water & Wastewater Treatment System
- Disinfection and Preliminary Treatment Upgrades
- Woodfibre LNG Project, British Columbia
- North West Upgrading Heavy Oil Upgrader
