logo

Patna Bakhtiarpur Tollway Limited

Sector: Automotive • Location: India

Source: World Bank Group

Project
Active

In December 2010, the National Highway Authority of India (NHAI) awarded a 20 year concession (including construction period of 30 months) to a consortium of BSCPL Infrastructure Limited (BSCPL) and C&C Constructions Limited, for the strengthening,improvement, 4-laning, operation and maintenance of 50.6kms of Patna-Bakhtiarpur section and of National Highway-30 (NH-30) in the state of Bihar.

Unde

Project Information FAQ

Project Information

5 Q
The project “Patna Bakhtiarpur Tollway Limited” is an infrastructure initiative in the Automotive sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2010, the National Highway Authority of India (NHAI) awarded a 20 year concession (including construction period of 30 months) to a consortium of BSCPL Infrastructure Limited (BSCPL) and C&C Constructions Limited, for the strengthening,improvement, 4-laning, operation and maintenance of 50.6kms of Patna-Bakhtiarpur section and of National Highway-30 (NH-30) in the state of Bihar. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance and strengthening of the existing carriageway to a 4-lane highway with paved shoulders. The scope includes strengthening & maintenance of existing carriageway including construction of 3 railway-over-bridges, 8 major bridges, 36 minor bridges and 16 vehicular/pedestrian underpasses,etc.The project will be undertaken in 2 phases. Four under passes will be constructed at a distance of 1.30 kilometre within the city to ensure smooth flow of traffic.The expansion project, a part of National Highway Development Project Phase -III, would help in decongesting the capital city of Patna by diverting the traffic from the existing bypass road. The consortium of BSCPL Infrastructure Limited (50% equity) and C&C Constructions Limited (50% equity),established a special purpose vehicle, Patna Bakhtiarpur Tollway Limited (PBTL),to implement the project. The SPV won the tender through competitive bidding, conducted by NHAI,by quoting the lowest upfront subsidy from NHAI of US$24.1mn (INR 1134mn @47 INR/USD).Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession.PBTL had entered into a lump-sum fixed-price EPC Agreement with BSCPL and C&C to undertake the EPC activity. The project attained financial closure on 16th November 2011.The grant/debt/equity ratio of the project was 11.1/66.7/22.2. The estimated capital cost of the project at the time of financial closure was US$ 217.3mn (INR 10214.2 mn @ 47 INR/USD) million. Apart from the NHAI subsidy, financing comprised INR 6810.2mn 15year term loan,and INR 2270mn sponsor equity. The debt was arranged by Axis Bank.The participating banks were Axis Bank (1010.2mn),Allahabad Bank (750mn), Bank of India (550mn),Central Bank of India (750mn),IIFCL (750mn),State Bank of Bikaner & Jaipur (500mn),State Bank of Hyderabad (750mn),State Bank of Mysore (500mn),State Bank of Patiala (750mn). Construction on the project began in September 2011 and was expected to be completed by March 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data