logo

Patna Bakhtiarpur Tollway Limited

Sector: Mass Transit • Location: India

Source: World Bank Group

Project
Active

In December 2010, the National Highway Authority of India (NHAI) awarded a 20 year concession (including construction period of 30 months) to a consortium of BSCPL Infrastructure Limited (BSCPL) and C&C Constructions Limited, for the strengthening,improvement, 4-laning, operation and maintenance of 50.6kms of Patna-Bakhtiarpur section and of National Highway-30 (NH-30) in the state of Bihar.

Unde

Status
Prospective
Sector
Mass Transit, Road, Tunnel, Bridge, Rail, Government, Residential, Automotive, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Patna Bakhtiarpur Tollway Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Patna Bakhtiarpur Tollway Limited” is an infrastructure initiative in the Mass Transit sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2010, the National Highway Authority of India (NHAI) awarded a 20 year concession (including construction period of 30 months) to a consortium of BSCPL Infrastructure Limited (BSCPL) and C&C Constructions Limited, for the strengthening,improvement, 4-laning, operation and maintenance of 50.6kms of Patna-Bakhtiarpur section and of National Highway-30 (NH-30) in the state of Bihar. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance and strengthening of the existing carriageway to a 4-lane highway with paved shoulders. The scope includes strengthening & maintenance of existing carriageway including construction of 3 railway-over-bridges, 8 major bridges, 36 minor bridges and 16 vehicular/pedestrian underpasses,etc.The project will be undertaken in 2 phases. Four under passes will be constructed at a distance of 1.30 kilometre within the city to ensure smooth flow of traffic.The expansion project, a part of National Highway Development Project Phase -III, would help in decongesting the capital city of Patna by diverting the traffic from the existing bypass road. The consortium of BSCPL Infrastructure Limited (50% equity) and C&C Constructions Limited (50% equity),established a special purpose vehicle, Patna Bakhtiarpur Tollway Limited (PBTL),to implement the project. The SPV won the tender through competitive bidding, conducted by NHAI,by quoting the lowest upfront subsidy from NHAI of US$24.1mn (INR 1134mn @47 INR/USD).Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession.PBTL had entered into a lump-sum fixed-price EPC Agreement with BSCPL and C&C to undertake the EPC activity. The project attained financial closure on 16th November 2011.The grant/debt/equity ratio of the project was 11.1/66.7/22.2. The estimated capital cost of the project at the time of financial closure was US$ 217.3mn (INR 10214.2 mn @ 47 INR/USD) million. Apart from the NHAI subsidy, financing comprised INR 6810.2mn 15year term loan,and INR 2270mn sponsor equity. The debt was arranged by Axis Bank.The participating banks were Axis Bank (1010.2mn),Allahabad Bank (750mn), Bank of India (550mn),Central Bank of India (750mn),IIFCL (750mn),State Bank of Bikaner & Jaipur (500mn),State Bank of Hyderabad (750mn),State Bank of Mysore (500mn),State Bank of Patiala (750mn). Construction on the project began in September 2011 and was expected to be completed by March 2014.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Tunnel, Bridge, Rail, Government, Residential, Automotive, Commercial

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project