Patos Ionic Clay Rare Earth Element Drill Program
Sector: Mining • Location: Patos, Brazil
Source: Stock Titan
The Patos Project is an early-stage ionic clay REE asset in Brazil. The company signed a letter of intent to acquire the project and is conducting a 10-hole auger drill program to evaluate mineralization and inform acquisition decisions. Completion of drilling is anticipated within one to two weeks, with lab results expected 6-8 weeks after.
- Status
- Under Construction
- Sector
- Mining
- Location
- Patos, Brazil
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about Patos Ionic Clay Rare Earth Element Drill Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Patos Project is an early-stage ionic clay REE asset in Brazil. The company signed a letter of intent to acquire the project and is conducting a 10-hole auger drill program to evaluate mineralization and inform acquisition decisions. Completion of drilling is anticipated within one to two weeks, with lab results expected 6-8 weeks after. |
Original sector | Mining |
Location
Country | Brazil |
City | Patos |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
