PATRICK HENRY PKWY FM END EXISTING RD TO EAGLES LANDING-GRTA
Sector: Car parking • Location: Stockbridge, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Patrick Henry Pkwy is proposed to be extended for a length of 0.47 mile from the current terminus of the existing road north to the proposed terminus of Patrick Henry Pkwy currently under construction under project NH-IM-75-2(212), P.I. No. 312150. The project is located between McDonough and Stockbridge parallel to and east of I-75. Proposed typical section is two 14 foot travel lanes (one in e
- Status
- Closed
- Sector
- Car parking, Bridge, Road, Government, Automotive
- Location
- Stockbridge, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about PATRICK HENRY PKWY FM END EXISTING RD TO EAGLES LANDING-GRTA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Patrick Henry Pkwy is proposed to be extended for a length of 0.47 mile from the current terminus of the existing road north to the proposed terminus of Patrick Henry Pkwy currently under construction under project NH-IM-75-2(212), P.I. No. 312150. The project is located between McDonough and Stockbridge parallel to and east of I-75. Proposed typical section is two 14 foot travel lanes (one in each direction and extra 2 foot width on the lanes is to provide for future bike lanes), 14 foot urban shoulders with 5 foot sidewalks. A culvert and a bridge will be constructed over Pates Creek and the floodplain. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Stockbridge |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Bridge, Road, Government, Automotive |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
