Patrick J. Ottensmeyer International Railway Bridge
Completed · Texas · Last reported Dec 2024
Source: Railway Age
The Patrick J. Ottensmeyer International Railway Bridge is a new second span crossing the Rio Grande, linking Laredo, Texas, with Nuevo Laredo, Tamaulipas, Mexico. It was dedicated by Canadian Pacific Kansas City (CPKC) in a ceremony on February 6, 2025, and is named in honor of the last President and CEO of Kansas City Southern, Patrick J. Ottensmeyer. The bridge enhances trade capacity between t
- Status
- Closed
- Sector
- Rail, Bridge, Mass Transit
- Location
- Laredo, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Railway Age
ConstructChat
Ask ConstructChat about Patrick J. Ottensmeyer International Railway Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Patrick J. Ottensmeyer International Railway Bridge is a new second span crossing the Rio Grande, linking Laredo, Texas, with Nuevo Laredo, Tamaulipas, Mexico. It was dedicated by Canadian Pacific Kansas City (CPKC) in a ceremony on February 6, 2025, and is named in honor of the last President and CEO of Kansas City Southern, Patrick J. Ottensmeyer. The bridge enhances trade capacity between the U.S. and Mexico. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Laredo |
Source
Source | Railway Age |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Mass Transit |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
