logo

PATRICK MILL RD/HARBINS RD @APALACHEE RIVER 3.6 MI S OF CARL

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project will replace the existing 112-ft length bridge on CR 93 (Patrick Mill Rd.), built in 1956 over Apalachee River in Barrow, Gwinnett County. 

The bridge consists of four spans of continuous steel beams on concrete caps with steel piles and is classified as serious. The design loading for this bridge is unknown and is assumed to be below current standards. Due to the age of the st

Status
Under Construction
Sector
Bridge, Steel, Cement
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about PATRICK MILL RD/HARBINS RD @APALACHEE RIVER 3.6 MI S OF CARL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “PATRICK MILL RD/HARBINS RD @APALACHEE RIVER 3.6 MI S OF CARL” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will replace the existing 112-ft length bridge on CR 93 (Patrick Mill Rd.), built in 1956 over Apalachee River in Barrow, Gwinnett County.  The bridge consists of four spans of continuous steel beams on concrete caps with steel piles and is classified as serious. The design loading for this bridge is unknown and is assumed to be below current standards. Due to the age of the structure, the condition of the superstructure, and not meeting current design standards, the replacement of this bridge is recommended. Off-site Detour is planned. Construction is estimated to be 9 months.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Steel, Cement

Article published date

2026-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project