logo
ProjectProject In Planning

Patriots Crossing P3 project

The status, timeline and source of this project. A free account opens every field.

Source: InfraPPPWorld

The purpose behind this project is to construct a new four-lane tunnel and bridge system between the I-564 Intermodal Connector in Norfolk and the Monitor-Merrimac Memorial Bridge-Tunnel. It would also include a connection to Craney Island in Portsmouth.

Status
Prospective
Sector
Tunnel, Bridge, Road
Location
United States of America
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Patriots Crossing P3 project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Patriots Crossing P3 project” is an infrastructure initiative in the Tunnel sector, located in (USA) United States of America. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Not available for this record.

Status

Original status

project in planning

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose behind this project is to construct a new four-lane tunnel and bridge system between the I-564 Intermodal Connector in Norfolk and the Monitor-Merrimac Memorial Bridge-Tunnel. It would also include a connection to Craney Island in Portsmouth.

Original sector

Transport

Procurement method

Location

Country

United States of America (USA)

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Tunnel, Bridge, Road

Article published date

2025-03-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project