logo

Patterson Rd E Culvert Replacement

Sector: Cement • Location: Crocker, Washington, United States of America

Source: Dodge USA

Project
Closed

Scope - This project provides for the improvement the Rauch Creek Culvert (BR #34195-A) located on Patterson Road East by replacing the failing culvert pipe with a precast concrete four-sided box culvert cast-in-place concrete retaining walls two temporary vehicle bypasses temporary gravity and geosynthetic walls a temporary fish bypass for Rauch Creek re-alignment of Rauch Creek guardrail paving

Status
Closed
Sector
Cement, Road, Waste Processing and Treatment, Automotive, Water Supply and Storage, Mass Transit, Government, Rail, Commercial
Location
Crocker, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Patterson Rd E Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Patterson Rd E Culvert Replacement” is an infrastructure initiative in the Cement sector, located in Crocker, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope - This project provides for the improvement the Rauch Creek Culvert (BR #34195-A) located on Patterson Road East by replacing the failing culvert pipe with a precast concrete four-sided box culvert cast-in-place concrete retaining walls two temporary vehicle bypasses temporary gravity and geosynthetic walls a temporary fish bypass for Rauch Creek re-alignment of Rauch Creek guardrail paving and all other work and other work

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Crocker

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Road, Waste Processing and Treatment, Automotive, Water Supply and Storage, Mass Transit, Government, Rail, Commercial

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project