logo
ProjectFinancial Close

Pattullo Bridge Replacement P3 Project

One of 10,000+ projects Taiyo tracks in British Columbia.

Source: InfraPPPWorld

The project involves the toll-free replacement bridge which will be built to modern safety standards, with a centre barrier and wider lanes. It will also have separated walking and cycling lanes on both sides. There will also be smoother connections on and off the new Pattullo Bridge with new direct road connections between the bridge and East Columbia Street in New Westminster, and a new direct o

Status
Closed
Sector
Government, Automotive, Bridge, Road
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Pattullo Bridge Replacement P3 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pattullo Bridge Replacement P3 Project” is an infrastructure initiative in the Government sector, located in British Columbia, Canada. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Company

Status

Original status

financial close

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the toll-free replacement bridge which will be built to modern safety standards, with a centre barrier and wider lanes. It will also have separated walking and cycling lanes on both sides. There will also be smoother connections on and off the new Pattullo Bridge with new direct road connections between the bridge and East Columbia Street in New Westminster, and a new direct off-ramp from the bridge to westbound Highway 17 in Surrey.The Pattullo Bridge, one of the oldest bridges in the Lower Mainland, was opened in 1937. It links the cities of New Westminster on the north side of the Fraser river and Surrey on the south bank in British Columbia. Since the opening of the Port Mann Bridge, the traffic volume on the Pattullo Bridge has risen from the historical volume of 70,000 vehicles per day to the current volume of 80,000 vehicles per day.When the new bridge is open, the existing bridge will be removed.

Original sector

Transport

Procurement method

Budget

Location

Country

Canada

State

British Columbia

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Government, Automotive, Bridge, Road

Article published date

2025-03-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project