Pattullo Bridge Replacement Project, British Columbia
Sector: Bridge • Location: Canada
Source: Road Traffic Technology
The Pattullo replacement bridge will be constructed upstream and parallel to the existing Pattullo Bridge across the Fraser River. Credit: Government of British Columbia. The new Pattullo Bridge will feature dedicated walking and cycling lanes. Credit: the Government of British Columbia. The existing Pattullo bridge structure will be demolished, upon commissioning of the new bridge in 2023. Credit
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Pattullo replacement bridge will be constructed upstream and parallel to the existing Pattullo Bridge across the Fraser River. Credit: Government of British Columbia. The new Pattullo Bridge will feature dedicated walking and cycling lanes. Credit: the Government of British Columbia. The existing Pattullo bridge structure will be demolished, upon commissioning of the new bridge in 2023. Credit: Reg Natarajan. The proposed Pattullo Bridge Replacement Project will replace the existing Patullo Bridge with a new four-lane cable suspension bridge. The Pattullo Bridge, which provides a direct connection between the cities of New Westminster and Surrey in British Columbia, Canada, was built in 1937. The bridge was originally designed for a life span of 50 years. The service life of the aging bridge has been extended by more than 30 years. However, efforts to further prolong its use were no longer thought to be cost-effective. In May 2019, the replacement project received a project and environmental review permit from the Vancouver Fraser Port Authority. Construction will commence in late 2019, while the new bridge is expected to be commissioned in 2023. Upon its opening, the existing Pattullo Bridgewill be demolished. The C$1.37bn (£828.8m) project will be funded, delivered and owned by the Province of British Columbia. The new bridge will be constructed upstream and parallel to the existing Pattullo Bridge across the Fraser River. The in-stream project components will be laid within the Vancouver Fraser Port Authority (VFPA) jurisdiction, while the Surrey approach spans over leased VFPA property adjacent to the Fraser River crossing. The project will utilise a design-build approach, which will result in variations between the authorised plans and the contractor’s final design. However, the design will not impede any potential future expansion of the bridge to six lanes. The New Westminster approach of the bridge will offer a direct connection to McBride Boulevard, while new direct ramps will be built to link the bridge to East Columbia Street. The Surrey approach of the bridge will be linked to King George Boulevard, while a new off-ramp will be constructed between the bridge and westbound Highway 17. To encourage less motorised travel over the Fraser River, the new Pattullo Bridge will feature walking and cycling lanes on each side, separated from motorised traffic by fixed barriers. It will provide network connections to New Westminster and Surrey. The bridge and its approaches will be located within the Certified Project Boundary of the river bank. Reinforced concrete is proposed to be used for the concrete piers and abutments. A maximum of four in-river piers will be constructed outside of the navigation protection zone defined by the Vancouver Fraser Port Authority. The approach section will consist of nine piers within the South Mainline Approach Area. Grade separation superstructures will be constructed with steel girders or precast, pre-stressed concrete girders and reinforced concrete deck slabs. Compacted backfill will be placed up to the abutments after the superstructure is complete. The bridge will measure approximately 1.5km-long and will have a minimum vertical navigational clearance that accommodates the navigation protection zone according to the Navigation Protection Act. The through lane will have a width of 3.6m, while each single-lane ramp will have a width of 4.8m. The long span structure of the bridge will enable the construction of foundations in locations that will minimise changes to the river hydraulics due to the bridge structure. Temporary trestles and barge-mounted equipment will be used to install the crossing. The Pattullo Bridge replacement project also involves the removal of the old bridge, once the new bridge is operational. The existing structure will be dismantled sequentially, starting with the removal of span elements and followed by the removal of the pier. Scrap materials from the dismantled bridge will either be recycled or disposed of, according to regulatory requirements. TransLink was involved in the conceptual development and planning phases of the bridge replacement project. The Government of British Columbia shortlisted three teams for the Pattullo Bridge replacement project, including Fraser Community Connectors, Flatiron / Dragados / Carlson Pattullo JV and Fraser Crossing Partners. The preferred bidder will be announced by the government at the end of 2019. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
