logo
ProjectPre-Design

PA/Turnpike MP 180-186 Total Reconstruction

Pre-design · Pennsylvania · Last reported Oct 2024

Source: Dodge USA

Project Summary: Total reconstruction and widening to three lanes in each direction from the Fort Littleton Interchange to the Tuscarora Tunnel. The project will include the reconstruction of the existing roadway to accommodate six 12-foot travel lanes with 12-foot left and right shoulders and a 2-foot median barrier as well as the flattening of several existing substandard horizontal curves. In a

Status
Prospective
Sector
Tunnel, Bridge, Road, Commercial, Manufacturing (Industrial)
Location
Fort Littleton, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PA/Turnpike MP 180-186 Total Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA/Turnpike MP 180-186 Total Reconstruction” is an infrastructure initiative in the Tunnel sector, located in Fort Littleton, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Summary: Total reconstruction and widening to three lanes in each direction from the Fort Littleton Interchange to the Tuscarora Tunnel. The project will include the reconstruction of the existing roadway to accommodate six 12-foot travel lanes with 12-foot left and right shoulders and a 2-foot median barrier as well as the flattening of several existing substandard horizontal curves. In addition, this project will require the replacement of 5 mainline bridges carrying the Turnpike tr...

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Fort Littleton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Tunnel, Bridge, Road, Commercial, Manufacturing (Industrial)

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project