Paul B. Loyd Jr Semi-Submersible Rig Contract Extension
The owner, status and timeline of this project. A free account opens every field.
Source: Offshore Engineer Magazine
Dolphin Drilling has signed a letter of intent for a potential new contract for its Paul B. Loyd Jr semi-submersible rig, which could keep the unit working through 2030. The contract duration is about two-and-a-half years, running until August 2030, in direct continuation of the rig's current contract with Harbour Energy. The rig is a mid-water harsh-environment rig capable of operating in water d
- Status
- Prospective
- Sector
- Water Supply and Storage, Seaport
- Updated
- 22 Jul 2026
- Source
- Offshore Engineer Magazine
ConstructChat
Ask ConstructChat about Paul B. Loyd Jr Semi-Submersible Rig Contract Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dolphin Drilling has signed a letter of intent for a potential new contract for its Paul B. Loyd Jr semi-submersible rig, which could keep the unit working through 2030. The contract duration is about two-and-a-half years, running until August 2030, in direct continuation of the rig's current contract with Harbour Energy. The rig is a mid-water harsh-environment rig capable of operating in water depths of up to 600 meters, based on an enhanced Aker H-4.2 design. |
Original sector | Energy |
Location
| Not available for this record. |
Source
Source | Offshore Engineer Magazine |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport |
Article published date | 2026-04-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- NE 148th Street Infiltration Facilities Project
- Vision Zero State Street Undercrossing Project
- SV 22-03 - FY 2021-2022 Annual Minor Streets Rehabilitation Program - CDBG
- SV 23-12 - FY 2023-24 Annual Major Streets Rehabilitation Program: Erringer Road
- SV 22-15 - FY 2021-2022 Annual Major Streets Rehabilitation Program: Cochran Street
