Paulding County Animal Control Shelter Facility Renovation
Sector: Raw Materials • Location: Dallas, Georgia, United States of America
Source: Dodge
Paulding County Animal Control Shelter located at 54 Industrial Way N, Dallas, GA 30132. The scope of work will include all required trades and materials to construct a new 1,100 s.f. Sally Port, a 16,886 s.f. interior renovation to an existing metal building facility previously used as an adult recreation center, and a new 674 s.f. open-air outdoor kennel area for a total of 18,660 s.f. See sheet
- Status
- Closed
- Sector
- Raw Materials, Seaport, Manufacturing (Industrial), Commercial, Government, Metal
- Location
- Dallas, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Paulding County Animal Control Shelter Facility Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Paulding County Animal Control Shelter located at 54 Industrial Way N, Dallas, GA 30132. The scope of work will include all required trades and materials to construct a new 1,100 s.f. Sally Port, a 16,886 s.f. interior renovation to an existing metal building facility previously used as an adult recreation center, and a new 674 s.f. open-air outdoor kennel area for a total of 18,660 s.f. See sheets G000 & G001 for the project description regarding the scope of work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Dallas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Seaport, Manufacturing (Industrial), Commercial, Government, Metal |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
