PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The project includes the installation of the second phase of a field communication system. Fiber optic cable will be installed from the TCC and extend along Industrial Way North, Industrial Boulevard, East Memorial Drive, SR 6 Business, SR 6, SR 92, and SR 360. The cable will interface with traffic signals at 27 intersections. CCTV cameras will be provided at each signalized intersection.
- Status
- Closed
- Sector
- Broadband, Manufacturing (Industrial), Telecommunications, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the installation of the second phase of a field communication system. Fiber optic cable will be installed from the TCC and extend along Industrial Way North, Industrial Boulevard, East Memorial Drive, SR 6 Business, SR 6, SR 92, and SR 360. The cable will interface with traffic signals at 27 intersections. CCTV cameras will be provided at each signalized intersection. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Broadband, Manufacturing (Industrial), Telecommunications, Government |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
- INSTALLATION OF A WIRELESS COMM FAC ON (E) WOODEN UTILITY PO LEN TH ROW; CONSISTS OF 2 RRU RADIOS), POWER METER,
