logo

Paul's Peak Waste Rock Project

Sector: Manufacturing (Industrial) • Location: Canada

Source: Bird Construction

Project
Unknown

A large fault - a fracture in the rock resulting from earth movement - was detected on the upper portion of the exposed face, which could pose a risk to mining operations below. Consequently, approximately 40 million tons of material has to be removed from the wall to deal with the safety issue and to permit access to additional ore. The biggest challenge thus far has been HJO's ability to work wi

Project Information FAQ

Project Information

3 Q
The project “Paul's Peak Waste Rock Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A large fault - a fracture in the rock resulting from earth movement - was detected on the upper portion of the exposed face, which could pose a risk to mining operations below. Consequently, approximately 40 million tons of material has to be removed from the wall to deal with the safety issue and to permit access to additional ore. The biggest challenge thus far has been HJO's ability to work within the blasting constraints and produce material that is sufficiently fractured and heaved to permit efficient excavation operations. Furthermore, different rock varieties have reacted differently to the drill and blast designs. By adjusting drilling patterns, powder factors and drill hole blasting sequence, the team has been able to achieve more efficient excavation operations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data