Pavement Cuts Restoration
Closed · Manitoba · Last reported Apr 2021
Source: Dodge USA
D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of all that is required for the permanent restoration of pavement cuts for the City of Winnipeg Public Works Department. This Work is to be completed in accordance with the latest versions of the City of Winnipeg Public Works Street Cuts Manual, the Manual of Temporary Traffic Control in Work Area on City Streets, Standard
- Status
- Closed
- Sector
- Commercial, Road, Manufacturing (Industrial)
- Location
- Winnipeg, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pavement Cuts Restoration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of all that is required for the permanent restoration of pavement cuts for the City of Winnipeg Public Works Department. This Work is to be completed in accordance with the latest versions of the City of Winnipeg Public Works Street Cuts Manual, the Manual of Temporary Traffic Control in Work Area on City Streets, Standard Construction Specifications, and any other applicable standards, on behalf of Public Works for a... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Manitoba |
City | Winnipeg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Manufacturing (Industrial) |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
