Pavement Restoration on the 18L-36R Runway at the Adolfo Suárez Madrid-Barajas Airport

Sector: Airport • Location: Madrid, Spain

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects Pavement Restoration on the 18L-36R Runway at the Adolfo Suárez Madrid-Barajas Airport Madrid, Spain €+10M Total Budget 70000t Flexible Pavement 24h/5d Time Spent on Project +130 Trucks The restoration construction on the pavement on the 18L-36R runway and surrounding taxiways at the Adolfo Suárez Madrid-Barajas Airport, along with construction to eliminate obst

Project Information FAQ

Project Information

5 Q
The project “Pavement Restoration on the 18L-36R Runway at the Adolfo Suárez Madrid-Barajas Airport” is an infrastructure initiative in the Airport sector, located in Madrid, Spain. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Pavement Restoration on the 18L-36R Runway at the Adolfo Suárez Madrid-Barajas Airport Madrid, Spain €+10M Total Budget 70000t Flexible Pavement 24h/5d Time Spent on Project +130 Trucks The restoration construction on the pavement on the 18L-36R runway and surrounding taxiways at the Adolfo Suárez Madrid-Barajas Airport, along with construction to eliminate obstacles on that track, were awarded to Ferrovial Construction in 2016 for over €10 million. Our construction subsidiary Ferrovial Construction took up quite a challenge with this project, since it required working on the runway for a record 24 hours a day for five consecutive days, regenerating 70,000 tons of flexible pavement. To do so, it had 11 milling machines, 4 asphaltic agglomerate plants (two of which were installed by the Machinery Service inside the Airport), 10 asphalt spreading crews, and over 130 trucks. The project also includes 240 kilometers of primary guidewires, 21 kilometers of secondary wire, and 2,000 buoys installed. The state of the runway fringes were also improved, and more than 2,000 elements, such as catch basins, signaling, underground galleries, and more have been updated. The 18L-36R runway is 3,500 meters long and 60 meters wide, and it went into service in 2006. Aena tackled this job before the useful life of the infrastructure ended, thus proactively addressing situations that could have compromised the airport's operational capacity. The runway's performance in terms of operational capacity was planned and coordinated beforehand with operators and Enaire, the aerial navigation service provider, so that it was possible to do so and not impact the airport's normal operations. This project did have one more variable that turned out to be a critical one: the south wind, since airplanes had to land on the runway under construction with this wind. For this reason, planning had to be adjusted to the max in order to carry out the construction in a short window without the south wind and with the ever-present risk of needing to stop construction and get the runway operational in the middle of construction. After several attempts and last-minute cancellations, construction began on Friday, May 19, 2017, at 5:00 p.m. and ended on Wednesday, May 24, at 11:00 a.m., when the runway and surrounding taxiways opened to traffic.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data