Pavement Resurfacing Including HMA Surf Cse Mix
Sector: Car parking • Location: Homer Glen, Illinois, United States of America
Source: Dodge USA
Consists Of Var. Width Pavement Resurfacing Including Hma Surf Cse,mix "D",n50 (5,507 Ton); Poly Hma Binder Cse,il-4.75,n50 (2,098 Ton); Hma Binder Cse,il-19.0,n50 (790 Ton); Hot-mix Asphalt Surface Removal, (Var Depths) (48,475sq Yd); Hma Surface Removal, 4 Inch (6,100 Sq. Yd), Pulverization (6,100 Sq. Yd), Pcc Sidewalk Rem & Repl (5,500 Sq Ft); Comb Conc Curb & Gutter Rem & Repl (3,310 Sq.ft); C
- Status
- Closed
- Sector
- Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Homer Glen, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pavement Resurfacing Including HMA Surf Cse Mix
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Consists Of Var. Width Pavement Resurfacing Including Hma Surf Cse,mix "D",n50 (5,507 Ton); Poly Hma Binder Cse,il-4.75,n50 (2,098 Ton); Hma Binder Cse,il-19.0,n50 (790 Ton); Hot-mix Asphalt Surface Removal, (Var Depths) (48,475sq Yd); Hma Surface Removal, 4 Inch (6,100 Sq. Yd), Pulverization (6,100 Sq. Yd), Pcc Sidewalk Rem & Repl (5,500 Sq Ft); Comb Conc Curb & Gutter Rem & Repl (3,310 Sq.ft); Class D Patches (1,540 Sq Yd); Drain & Utility Str. To Be Adjusted (25 Each); Drain & Utility Str.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Homer Glen |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
