logo
ProjectBid Results

Pavement Resurfacing

Sector: Commercial • Location: Carpentersville, Illinois, United States of America

Source: Dodge USA

CONST. VARIABLE WIDTH PAVEMENT RESURFACING WITH HOT-MIX ASPH. SURF. CSE. MIX "D", N50 (6,475 TON); INCL. 12,785 TON POLY HMA BIND. CSE. IL-4.75, N50; 64,005 SQ YD HMA SURF REM,2 1/4 inch; 350 SQ YD PVMT PATCHING; 3,476 FT COMB CONC CURB & GUTTER REM & REPL; 5,100 SQ FT PCC SIDEWALK REM & REPL; 102 EACH DRAIN & UTIL STR ADJUST; 1,757 FT THPL PVT MRK; ETC. (3.21MILES)

Status
Closed
Sector
Commercial, Road, Government, Car parking, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Manufacturing (Industrial)
Location
Carpentersville, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Pavement Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pavement Resurfacing” is an infrastructure initiative in the Commercial sector, located in Carpentersville, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

CONST. VARIABLE WIDTH PAVEMENT RESURFACING WITH HOT-MIX ASPH. SURF. CSE. MIX "D", N50 (6,475 TON); INCL. 12,785 TON POLY HMA BIND. CSE. IL-4.75, N50; 64,005 SQ YD HMA SURF REM,2 1/4 inch; 350 SQ YD PVMT PATCHING; 3,476 FT COMB CONC CURB & GUTTER REM & REPL; 5,100 SQ FT PCC SIDEWALK REM & REPL; 102 EACH DRAIN & UTIL STR ADJUST; 1,757 FT THPL PVT MRK; ETC. (3.21MILES)

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Carpentersville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Road, Government, Car parking, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Manufacturing (Industrial)

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project