Paving - Route 10, Little River Bridge No.1 to Route 670 Area
Completed · New Brunswick
Source: Infrastructure Canada
This project consists of surface rehabilitation of approximately 2.6 km of Rte 10 Little River Bridge No. 1 to Rte 670 Area. The work will include full depth recycling and paving. This section of road services the small communities in the area of Albrights Corner. The surface of the road has potholes and cracking in both the longitudinal and transverse direction. After construction the roadway wil
- Status
- Closed
- Sector
- Road, Bridge, Government
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Paving - Route 10, Little River Bridge No.1 to Route 670 Area
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of surface rehabilitation of approximately 2.6 km of Rte 10 Little River Bridge No. 1 to Rte 670 Area. The work will include full depth recycling and paving. This section of road services the small communities in the area of Albrights Corner. The surface of the road has potholes and cracking in both the longitudinal and transverse direction. After construction the roadway will have improved rideability and strength. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
