Paving & Utility Rehab & Reconstruction Improvement
Sector: Water Supply and Storage • Location: Fargo, North Dakota, United States of America
Source: Dodge USA
9th Avenue South from 5th Street to 8th Street, 10th Avenue South from 5thStreet to 7th Street, 6th Street South from 9th Avenue to 11th Avenue, 7thStreet South from 9th Avenue to 11th Avenue. The existing water main is cast iron pipe (CIP) and asbestos concrete pipe (ACP), which was installed up to 105 years ago and is being replaced with polyvinyl chloride (PVC) to minimize impacts and costs ass
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Metal, Cement, Government, Steel
- Location
- Fargo, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Paving & Utility Rehab & Reconstruction Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 9th Avenue South from 5th Street to 8th Street, 10th Avenue South from 5thStreet to 7th Street, 6th Street South from 9th Avenue to 11th Avenue, 7thStreet South from 9th Avenue to 11th Avenue. The existing water main is cast iron pipe (CIP) and asbestos concrete pipe (ACP), which was installed up to 105 years ago and is being replaced with polyvinyl chloride (PVC) to minimize impacts and costs associated with breaks. The street reconstruction is necessary because the existing street section h... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Fargo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Metal, Cement, Government, Steel |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
