Paving and Utility Rehab/Reconstruction Improvement
Sector: Power Transmission • Location: Fargo, North Dakota, United States of America
Source: Dodge USA
for the construction of Paving and UtilityRehab/Reconstruction, Improvement District No. BR- 24-F1 of the following:Northern Pacific Ave N from 8th St to 170 E of 8th St N; 8th St N from BNSF RRTracks to 100 N of Northern Pacific Ave N.Bids shall be on the basis of cash payment for work performed. All work includedin the contract must be fully completed on or before August 17, 2024.
- Status
- Closed
- Sector
- Power Transmission, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Fargo, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Paving and Utility Rehab/Reconstruction Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | for the construction of Paving and UtilityRehab/Reconstruction, Improvement District No. BR- 24-F1 of the following:Northern Pacific Ave N from 8th St to 170 E of 8th St N; 8th St N from BNSF RRTracks to 100 N of Northern Pacific Ave N.Bids shall be on the basis of cash payment for work performed. All work includedin the contract must be fully completed on or before August 17, 2024. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Fargo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
