logo

Paving Grading & Utilities Kirkwood Crossing Phase 1

Sector: Water Supply and Storage • Location: Katy, Texas, United States of America

Source: Dodge USA

Project
Bid Results

Scope - Construction of approximately 3,985 linear feet of 8-Inch to 12-Inch waterline, approximately 1,960 linear feet of 24-Inch Reinforced Concrete Pipe to 4-Foot by 2-Foot Reinforced Concrete box storm sewer, approximately 2,575 linear feet of 8-Inch to 12-Inch sanitary sewer, approximately 8,785 SY of pavement and erosion control to serve Kirkwood Crossing Phase 1.

Status
Closed
Sector
Water Supply and Storage, Commercial, Cement, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)
Location
Katy, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Paving Grading & Utilities Kirkwood Crossing Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Paving Grading & Utilities Kirkwood Crossing Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Katy, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope - Construction of approximately 3,985 linear feet of 8-Inch to 12-Inch waterline, approximately 1,960 linear feet of 24-Inch Reinforced Concrete Pipe to 4-Foot by 2-Foot Reinforced Concrete box storm sewer, approximately 2,575 linear feet of 8-Inch to 12-Inch sanitary sewer, approximately 8,785 SY of pavement and erosion control to serve Kirkwood Crossing Phase 1.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Katy

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Cement, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project