Paving System - Section I
Closed · Nebraska · Last reported Jun 2024
Source: Dodge USA
The work consists essentially of the following estimated quantities: 1 Mobilization 1 LS 2 Remove Pavement 1,222.22 SY 3 Saw Cut-Full Depth 100.00 LF 4 Subgrade Preparation 65,287.00 SY 5 Construct 7" Concrete Pavement (Type L65) 61,402.00 SY 6 Construct 10" Concrete Pavement (Type L75) 3,885.00 SY 7 Construct 6" PCC Median Surfacing 998.00 SF 8 Construct 6" Concrete Base (Type OPW 3500) 3,882.00
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government
- Location
- Omaha, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Paving System - Section I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists essentially of the following estimated quantities: 1 Mobilization 1 LS 2 Remove Pavement 1,222.22 SY 3 Saw Cut-Full Depth 100.00 LF 4 Subgrade Preparation 65,287.00 SY 5 Construct 7" Concrete Pavement (Type L65) 61,402.00 SY 6 Construct 10" Concrete Pavement (Type L75) 3,885.00 SY 7 Construct 6" PCC Median Surfacing 998.00 SF 8 Construct 6" Concrete Base (Type OPW 3500) 3,882.00 SY 9 Adjust Manhole to Grade 5.00 EACH 10 Adjust Sanitary Sewer Manhole to Grade 56.00 EACH 11 In... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Omaha |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
