PB25-05965 - Commercial Accessory Structure - Issued
The status, timeline and source of this project. A free account opens every field.
Source: City of Fort Worth Open Data Portal
Install a public art sculpture in Sycamore Park. The installation sequence is digging and pouring for the foundation work at least twenty-one days prior to sculpture placement, as well as running any electrical provisions. Then bringing in a truck with the sculpture, fully preassembled, and a piece of lifting equipment to remove the sculpture from the truck and place it upon predetermined locatio
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Fort Worth, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Fort Worth Open Data Portal
ConstructChat
Ask ConstructChat about PB25-05965 - Commercial Accessory Structure - Issued
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | issued |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install a public art sculpture in Sycamore Park. The installation sequence is digging and pouring for the foundation work at least twenty-one days prior to sculpture placement, as well as running any electrical provisions. Then bringing in a truck with the sculpture, fully preassembled, and a piece of lifting equipment to remove the sculpture from the truck and place it upon predetermined locations on the foundation. After anchors are fastened, and any segments added to complete the final assembly, lighting is addressed by chasing wires either from the power source or through conduit, and connected to any components of the electrical system. This involves bringing power to a power supply/transformer that will power the in ground lights. Timers are part of the lighting system, but they are mounted with an enclosure near the breaker box that is providing the 110v power. After a walk-through with stakeholders, a punch list is determined and any touch-up work is completed, then a maintenance manual (with as-built drawings, diagrams, and spec sheets for electrical components, etc.) for short and long term care is provided. “Energetic” by Blessing Hancock |
Location
Country | United States of America (USA) |
State | Texas |
City | Fort Worth |
Source
Source | City of Fort Worth Open Data Portal |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
