logo
ProjectIssuedBP

PB25-05965 - Commercial Accessory Structure - Issued

The status, timeline and source of this project. A free account opens every field.

Source: City of Fort Worth Open Data Portal

Install a public art sculpture in Sycamore Park. The installation sequence is digging and pouring for the foundation work at least twenty-one days prior to sculpture placement, as well as running any electrical provisions. Then bringing in a truck with the sculpture, fully preassembled, and a piece of lifting equipment to remove the sculpture from the truck and place it upon predetermined locatio

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Government
Location
Fort Worth, Texas, United States of America
Updated
19 Nov 2026
Source
City of Fort Worth Open Data Portal

ConstructChat

Ask ConstructChat about PB25-05965 - Commercial Accessory Structure - Issued

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PB25-05965 - Commercial Accessory Structure - Issued” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Fort Worth, Texas, United States of America. Taiyo aggregates data on it from City of Fort Worth Open Data Portal.

Participants

Sponsoring Agency

Status

Original status

issued

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Install a public art sculpture in Sycamore Park. The installation sequence is digging and pouring for the foundation work at least twenty-one days prior to sculpture placement, as well as running any electrical provisions. Then bringing in a truck with the sculpture, fully preassembled, and a piece of lifting equipment to remove the sculpture from the truck and place it upon predetermined locations on the foundation. After anchors are fastened, and any segments added to complete the final assembly, lighting is addressed by chasing wires either from the power source or through conduit, and connected to any components of the electrical system. This involves bringing power to a power supply/transformer that will power the in ground lights. Timers are part of the lighting system, but they are mounted with an enclosure near the breaker box that is providing the 110v power. After a walk-through with stakeholders, a punch list is determined and any touch-up work is completed, then a maintenance manual (with as-built drawings, diagrams, and spec sheets for electrical components, etc.) for short and long term care is provided. “Energetic” by Blessing Hancock

Location

Country

United States of America (USA)

State

Texas

City

Fort Worth

Source

Source

City of Fort Worth Open Data Portal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-11-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project