Příbram-Písek D4 motorway PPP project in Czech Republic
Closed · Czech Republic
Source: InfraPPPWorld
The project entails the design, construction, finance, operation, and maintenance of a 32 km, four-lane section of the D4 highway connecting Háje with Mirotice, plus the operation and maintenance of adjacent sections with a total length of 16 km.The highway is 84 km in total, linking Prague to the southwest of Bohemia, in the Czech Republic. Around 50 km are currently in operation.
- Status
- Closed
- Sector
- Road, Seaport, Aerospace & Defense, Government
- Location
- Czech Republic
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Příbram-Písek D4 motorway PPP project in Czech Republic
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the design, construction, finance, operation, and maintenance of a 32 km, four-lane section of the D4 highway connecting Háje with Mirotice, plus the operation and maintenance of adjacent sections with a total length of 16 km.The highway is 84 km in total, linking Prague to the southwest of Bohemia, in the Czech Republic. Around 50 km are currently in operation. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Czech Republic |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road, Seaport, Aerospace & Defense, Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
