logo

PCF Sugar Bagasse Cogeneration Project

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank

Project
Closed

The objective of the Prototype Carbon Fund - PCF - Sugar Bagasse Cogeneratioon Project is to reduce emissions by generating energy from renewable resources. It is designed to facilitate the implementation of several subprojects in Brazil, of which two sugar bagasse cogeneration projects are presented for approval. The Alta Mogiana Bagasse Cogeneration Project is hosted by Usina Alta Mogiana S.A.,

Project Information FAQ

Project Information

5 Q
The project “PCF Sugar Bagasse Cogeneration Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Prototype Carbon Fund - PCF - Sugar Bagasse Cogeneratioon Project is to reduce emissions by generating energy from renewable resources. It is designed to facilitate the implementation of several subprojects in Brazil, of which two sugar bagasse cogeneration projects are presented for approval. The Alta Mogiana Bagasse Cogeneration Project is hosted by Usina Alta Mogiana S.A., and focuses on increasing efficiency in the cogeneration process to produce more steam, and increase electricity output to supply the national grid. In the first phase, two 21 bar pressure boilers are refurbished and a new 25 MW turbo generator installed. The Guarani Cruz Alta Bagasse Cogeneration project is hosted by Azucar Guarani S.A. and focuses on installing new facilities to increase the electricity output from its generation plant. Under Phase I, a 21.8 MW backpressure turbo-generator will be installed and a 63 bar boiler. In Phase II a 25 MW pressure turbo-generator will be installed, as well as a 63 Bar boiler. The project will receive carbon finance, and project preparation and processing from the Prototype Carbon Fund (PCF).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data