logo

PCH Verde 2 Hydroelectric Power Plant

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Active

"This project involves the construction of the small hydroelectric power plant - PCH Verde 2, located on Verdão River, Rio Verde, state of Goias. Featuring two powerhouses and four Francis turbines, the plant will have an installed capacity of 21.59 megawatts. The reservoir, designed to cover approximately 680 hectares and extend 16 kilometers, is crucial to the operation's success. The sponsor f

Project Information FAQ

Project Information

4 Q
The project “PCH Verde 2 Hydroelectric Power Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"This project involves the construction of the small hydroelectric power plant - PCH Verde 2, located on Verdão River, Rio Verde, state of Goias. Featuring two powerhouses and four Francis turbines, the plant will have an installed capacity of 21.59 megawatts. The reservoir, designed to cover approximately 680 hectares and extend 16 kilometers, is crucial to the operation's success. The sponsor for this initiative is the Brazilian conglomerate Brasal Energia. The total project cost is $80m (R$420m) of which the sponsor has issued $33m (R$170m) in debentures, while the rest $47m (R$250m) will be financed with equity. The financial close date is April 22nd, 2024. " https://www.powerfinancerisk.com/article/2d52duoa7o501weyq8f0g/news/project-finance/brasal-issues-debentures-for-hydro-project-in-brazil#:~:text=Brazilian%20conglomerate%20Brasal%20is%20issuing,a%20hydroelectric%20project%20in%20Brazil. ; https://x.realfin.com/transaction/255576/pch-verde-ii-hydro-power-plant-225mw-debenture-2024 ; https://www.brasal.com.br/blog/brasal-energia/avanco-na-pch-verde-2-enchimento-reservatorio https://www.powerfinancerisk.com/article/2d52duoa7o501weyq8f0g/news/project-finance/brasal-issues-debentures-for-hydro-project-in-brazil#:~:text=Brazilian%20conglomerate%20Brasal%20is%20issuing,a%20hydroelectric%20project%20in%20Brazil. ; https://x.realfin.com/transaction/255576/pch-verde-ii-hydro-power-plant-225mw-debenture-2024 ; https://www.brasal.com.br/blog/brasal-energia/avanco-na-pch-verde-2-enchimento-reservatorio

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data