logo

PCHs Los Molinos S.A.S. E.S.P.

Sector: Power Generation (CCGT) • Location: Colombia

Source: Inter-American Development Bank (IADB)

Project
Closed

Los Molinos Project consists of the development, construction and operation of two small run of the river hydroelectric plants to be located in the Municipality of Cocorna, Department of Antioquia (PCH El Molino and PCH San Matias). Each plant will have an installed capacity of 19.9 MW and will collectively generate 246 GWh of clean energy per year. The Project is being developed by LAREIF, a Pana

Project Information FAQ

Project Information

4 Q
The project “PCHs Los Molinos S.A.S. E.S.P.” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Colombia. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Los Molinos Project consists of the development, construction and operation of two small run of the river hydroelectric plants to be located in the Municipality of Cocorna, Department of Antioquia (PCH El Molino and PCH San Matias). Each plant will have an installed capacity of 19.9 MW and will collectively generate 246 GWh of clean energy per year. The Project is being developed by LAREIF, a Panamanian company owned by Century Energy Corporation and The Cornerstone Group. LAREIF invests in renewable energy projects, has developed eight projects, of which five are operating and three are under construction for a total of 146 MW. The engineering, design, construction and supervision of the civil works of the Project will be undertaken by HMV Ingenieros (“HMV”), a major engineering firm in Colombia with experience in energy-related EPC Projects. The Project cost is estimated at US$ 125 Million. The two plants are expected to begin commercial operations in 2016.With this operation, the IIC will be supporting the development of small hydroelectric projects in Colombia by providing long term financing (up to seventeen years). The project will contribute to increasing Colombia’s installed power generation capacity and supplying additional electricity to meet the country’s energy demand. Run-of-river hydroelectric projects are a very low cost source of energy. The project will help increase the portfolio of low cost hydropower energy generation assets in Colombia.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data