PCR Renewables
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The proposed investment consists of a 7-year senior loan of up to US$ 150 million to Petroquimica Comodoro Rivadavia (“PCR” or the “Company”), comprising US$ 30 million from IFC’s own account and US$120 million mobilized from other lenders, to fund the greenfield construction of a 180MW wind farm in Olavarría and the upgrade of the associated power transmission infrastructure, including a transmis
- Status
- Prospective
- Sector
- Wind, Raw Materials, Oil and Gas, Waste Processing and Treatment, Warehouse, Commercial, Power Generation (CCGT), Government
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about PCR Renewables
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed investment consists of a 7-year senior loan of up to US$ 150 million to Petroquimica Comodoro Rivadavia (“PCR” or the “Company”), comprising US$ 30 million from IFC’s own account and US$120 million mobilized from other lenders, to fund the greenfield construction of a 180MW wind farm in Olavarría and the upgrade of the associated power transmission infrastructure, including a transmission line to the Olavarría substation, capacitor expansions at the Olavarría and Ezeiza substations operated by Transener and Edesur, respectively, and transformer repowering at the Bahía Blanca substation operated by Transener (the “Project”). |
Original sector | V-BC - Wind Power - Renewable Energy Generation |
Location
Country | Argentina |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Oil and Gas, Waste Processing and Treatment, Warehouse, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-12-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
