PDG SE1 Data Center Campus
Planned · South Korea · Last reported Nov 2025
Source: CRN Asia
PDG plans to build a 48 MW data center campus called PDG SE1 in Incheon, South Korea, covering roughly 11,000 square meters. The campus is designed for hyperscale and AI needs with high-density racks and cooling systems, aiming for Net Zero by 2030 and RE100 targets. Construction is scheduled to begin in November 2025 with an expected opening in early 2028.
- Status
- Prospective
- Sector
- Data Center
- Location
- Incheon, South Korea
- Updated
- 19 Nov 2026
- Source
- CRN Asia
ConstructChat
Ask ConstructChat about PDG SE1 Data Center Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | PDG plans to build a 48 MW data center campus called PDG SE1 in Incheon, South Korea, covering roughly 11,000 square meters. The campus is designed for hyperscale and AI needs with high-density racks and cooling systems, aiming for Net Zero by 2030 and RE100 targets. Construction is scheduled to begin in November 2025 with an expected opening in early 2028. |
Original sector | Data Center |
Budget |
Location
Country | South Korea |
City | Incheon |
Source
Source | CRN Asia |
URL |
More Details
Record type | Project |
Sector | Data Center |
Article published date | 2025-11-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
