PDHSA Small Hydro Power Plants
Sector: Hydro • Location: Guatemala
Source: World Bank Group
The local company Promociones y Desarrollos Hídricos, S.A. (PDHSA) was awarded contracts to build and operate two small hydro power plants located in Ixquisis, department of Huehuetenango. The power plants were named Hidroelectrica San Andres (10.65 MW) and Hidroelectrica Pojom II (20 MW). The 50-year contracts were awarded to the special purpose companies created to manage the contracts, GSM -
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Guatemala
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about PDHSA Small Hydro Power Plants
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The local company Promociones y Desarrollos Hídricos, S.A. (PDHSA) was awarded contracts to build and operate two small hydro power plants located in Ixquisis, department of Huehuetenango. The power plants were named Hidroelectrica San Andres (10.65 MW) and Hidroelectrica Pojom II (20 MW). The 50-year contracts were awarded to the special purpose companies created to manage the contracts, GSM - Generadora San Mateo (Pojom II) and GSA - Generadora San Andres in December 2011 and September 2013, respectively. The investment figures were not available (the value included as project cost was approximated to the value of the debt raised by the sponsor). The IIC approved a US$ 6 million loan for GSA and a US$ 9 million loan to GSM in September 2013. In 2014, the CABEI approved a US$ 5 million syndicated loan for GSA and a US$ 20 million syndicated loan to GSM. The electricity generated by the power plant was set to be directed to the national grid. Construction works commenced in 2013, and commercial operation was expected to begin in 2015. http://cordiantcap.com/icf_debpt/gsm-gsa/ |
Original sector | Energy |
Budget |
Location
Country | Guatemala |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
