logo
ProjectFinaledBP

PE12-07847 - Electrical - Finaled

The status, timeline and source of this project. A free account opens every field.

Source: City of Fort Worth Open Data Portal

In reference to PM12-04319 Replaced a

20amp three phase breaker with a

25amp two pole breaker and ran the

appropriate wire size.AS PER DALE

SMITH THE ADDRESS THEY USE IS

2850 HWY 114, FORT WORTH TX

  1. Permit Manager would not

recognize that address

Status
Prospective
Sector
Road, Government
Location
Fort Worth, Texas, United States of America
Updated
19 Nov 2026
Source
City of Fort Worth Open Data Portal

ConstructChat

Ask ConstructChat about PE12-07847 - Electrical - Finaled

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PE12-07847 - Electrical - Finaled” is an infrastructure initiative in the Road sector, located in Fort Worth, Texas, United States of America. Taiyo aggregates data on it from City of Fort Worth Open Data Portal.

Participants

Sponsoring Agency

Status

Original status

finaled

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

In reference to PM12-04319 Replaced a 20amp three phase breaker with a 25amp two pole breaker and ran the appropriate wire size.AS PER DALE SMITH THE ADDRESS THEY USE IS 2850 HWY 114, FORT WORTH TX 76117. Permit Manager would not recognize that address

Location

Country

United States of America (USA)

State

Texas

City

Fort Worth

Source

Source

City of Fort Worth Open Data Portal

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2025-11-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project