Pea Ridge Carr Street Improvements
Sector: Water Supply and Storage • Location: Pea Ridge, Arkansas, United States of America
Source: Dodge
The purpose of the Carr Street Reconstruction project is to revise the cross-section to a superelevated 2-lane vehicular travel way with curb and gutter, a 10 sidepath on the west side of Carr Street, and crosswalks to service the east side. The proposed improvements will extend from Townsend Way up to the intersection of West Patton St. The improvements include full-depth reconstruction consistin
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Car parking, Waste Processing and Treatment, Government, Automotive
- Location
- Pea Ridge, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Pea Ridge Carr Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the Carr Street Reconstruction project is to revise the cross-section to a superelevated 2-lane vehicular travel way with curb and gutter, a 10 sidepath on the west side of Carr Street, and crosswalks to service the east side. The proposed improvements will extend from Townsend Way up to the intersection of West Patton St. The improvements include full-depth reconstruction consisting of geotextile fabric, 16 inches of Class 7, and 3 inches of surface course asphalt throughout t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Pea Ridge |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Car parking, Waste Processing and Treatment, Government, Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
