logo

Peace Dam Project at Nakuetum

Sector: Hydro • Location: Turkana, Kenya

Source: The Eastleigh Voice

Project
Delayed With Arbitration Dispute

A dam project in Turkana County facing costly arbitration disputes due to delays, suspension of works, and disputed deductions. The arbitration awards and legal claims amount to Sh397.4 million, significantly higher than the original contract sum of Sh231 million signed in March 2020.

Status
Prospective
Sector
Hydro, Water Supply and Storage
Location
Turkana, Kenya
Updated
22 Jul 2026
Source
The Eastleigh Voice

ConstructChat

Ask ConstructChat about Peace Dam Project at Nakuetum

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Peace Dam Project at Nakuetum” is an infrastructure initiative in the Hydro sector, located in Turkana, Kenya. Taiyo aggregates data on it from The Eastleigh Voice.

Participants

Not available for this record.

Status

Original status

delayed with arbitration dispute

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A dam project in Turkana County facing costly arbitration disputes due to delays, suspension of works, and disputed deductions. The arbitration awards and legal claims amount to Sh397.4 million, significantly higher than the original contract sum of Sh231 million signed in March 2020.

Original sector

Water Resources

Budget

Location

Country

Kenya

City

Turkana

Source

Source

The Eastleigh Voice

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project