logo
ProjectPlanning

Peace River Nuclear Power Project

One of 10,000+ projects Taiyo tracks in Alberta.

Source: The Globe and Mail

Energy Alberta proposes constructing between two and four large-scale reactors in the Peace River area of northern Alberta, generating up to 4,800 MW of clean electricity. Construction would occur from 2028 to 2041, with the first unit operational in 2035.

Status
Prospective
Sector
Nuclear, Power Generation (CCGT)
Location
Alberta, Canada
Updated
22 Jul 2026
Source
The Globe and Mail

ConstructChat

Ask ConstructChat about Peace River Nuclear Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Peace River Nuclear Power Project” is an infrastructure initiative in the Nuclear sector, located in Alberta, Canada. Taiyo aggregates data on it from The Globe and Mail.

Participants

Not available for this record.

Status

Original status

planning

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Energy Alberta proposes constructing between two and four large-scale reactors in the Peace River area of northern Alberta, generating up to 4,800 MW of clean electricity. Construction would occur from 2028 to 2041, with the first unit operational in 2035.

Original sector

Energy

Location

Country

Canada

State

Alberta

Source

Source

The Globe and Mail

URL

More Details

Record type

Project

Sector

Nuclear, Power Generation (CCGT)

Article published date

2025-12-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project