Peace River Nuclear Power Project
One of 10,000+ projects Taiyo tracks in Alberta.
Source: The Globe and Mail
Energy Alberta proposes constructing between two and four large-scale reactors in the Peace River area of northern Alberta, generating up to 4,800 MW of clean electricity. Construction would occur from 2028 to 2041, with the first unit operational in 2035.
- Status
- Prospective
- Sector
- Nuclear, Power Generation (CCGT)
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- The Globe and Mail
ConstructChat
Ask ConstructChat about Peace River Nuclear Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Energy Alberta proposes constructing between two and four large-scale reactors in the Peace River area of northern Alberta, generating up to 4,800 MW of clean electricity. Construction would occur from 2028 to 2041, with the first unit operational in 2035. |
Original sector | Energy |
Location
Country | Canada |
State | Alberta |
Source
Source | The Globe and Mail |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT) |
Article published date | 2025-12-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Nuclear projects in Canada
- Bluenose Academy
- Waste Pollution Control Facility Upgrades - Phase 1 - LRAR
- The Bruce Power Generating Station Project
- Ottawa Cancer Centre (Queensway Carleton & The Ottawa Hospital)
- Cambridge Memorial Hospital
- Credit Valley Hospital Phase II Redevelopment Project
- Bruce Nuclear Power Plant
- Bruce Nuclear Power Plant (Phase 2)
