Peaceful Place BPS Site Improvements
Sector: Waste Processing and Treatment • Location: Carefree, Arizona, United States of America
Source: Dodge USA
Peaceful Place BPS Site Improvements. The project generally consists of the installation of a package booster pump station with two new duty pumps and one high flow pump, the removal a 5,000 gallon pressure tank, installation of miscellaneous yard piping, and reconfiguration of the site within the confines of an existing walled facility.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Carefree, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Peaceful Place BPS Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Peaceful Place BPS Site Improvements. The project generally consists of the installation of a package booster pump station with two new duty pumps and one high flow pump, the removal a 5,000 gallon pressure tank, installation of miscellaneous yard piping, and reconfiguration of the site within the confines of an existing walled facility. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Carefree |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
