Peachtree Creek Trunk Sewer Stabilization
Sector: Car parking • Location: Georgia, United States of America (USA)
Source: Atlanta Watershed
The Sewer System Evaluation Survey (SSES), required by the First Amended Decree (FACD), was designed to evaluate the condition of the City’s sanitary sewer collection and transmission system and carried out over eight years across six sewer groups. Peachtree Trunk, a 90- to 96-inch concrete line, was constructed in the late 1930s. This project is to stabilize the many longitudinal and circumferent
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete / construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Sewer System Evaluation Survey (SSES), required by the First Amended Decree (FACD), was designed to evaluate the condition of the City’s sanitary sewer collection and transmission system and carried out over eight years across six sewer groups. Peachtree Trunk, a 90- to 96-inch concrete line, was constructed in the late 1930s. This project is to stabilize the many longitudinal and circumferential cracks identified in the Peachtree Trunk to ensure structural integrity is retained under varying conditions while conveying sewage. The scope of this project includes: Cleaning the Woodward Way Siphon, located within the vicinity of Bobby Jones Golf Course Cleaning 700 LF of 96″ pipe, 1,300 LF of90″ pipe and 1,800 LF of 66″ pipe Installation of approximately 11,000linear feet (LF) of grouted PVC profile liner system, extending from Atlanta Memorial Park to the R. M. Clayton WRC Justification: Reduce inflow/infiltration from entering sewer and robbing needed capacity Safeguards against future breaches and ensures public health and safety Ensures long-term structural integrity of the 90″ diameter trunk sewer for 50+years Addresses Consent Decree requirements |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Car parking projects in United States of America (USA)
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
- SH 36 from FM 2218 to FM 1495 - Brazoria County
- SH 6 Reconstruction - Gorman
- Memorial Drive from BW 8 to Tallowood Road
