logo

Pearl River Flood Risk Management (FRM) ("One Lake")

Sector: Hydro • Location: Pearl River, Mississippi, United States of America

Source: Dodge

Project
Pre-Design

Flood control for the part of the Pearl River that runs along Jackson. Two proposals preferred. One of them resembles the "One Lake" plan. To include building levees, lowering the river's banks, and elevating and floodproofing vulnerable structures. Alternative E1 omits building the prior considered dam on the Pearl River. Alternative E1 to cost between $708M and $753M. Alternative D1 to cost betw

Status
Prospective
Sector
Hydro, Manufacturing (Industrial), Commercial, Government, Water Supply and Storage
Location
Pearl River, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Pearl River Flood Risk Management (FRM) ("One Lake")

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pearl River Flood Risk Management (FRM) ("One Lake")” is an infrastructure initiative in the Hydro sector, located in Pearl River, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Flood control for the part of the Pearl River that runs along Jackson. Two proposals preferred. One of them resembles the "One Lake" plan. To include building levees, lowering the river's banks, and elevating and floodproofing vulnerable structures. Alternative E1 omits building the prior considered dam on the Pearl River. Alternative E1 to cost between $708M and $753M. Alternative D1 to cost between $873M and $918M. Federal government to cover 65% of costs.

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Pearl River

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Hydro, Manufacturing (Industrial), Commercial, Government, Water Supply and Storage

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project