Pearl Street Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Pearl Street, this project includes, but is not limited to, approximately 625 linear feet of curb and gutter, 490 linear feet of laydown curb, 2,885 SY of lime stabilized subgrade and 6 crushed limestone base material, 2,885 square yards of 7 reinforced concrete pavement, transfer of existing water services, SWPPP installations, and traffic control. There is also Add Alternate A which includes, bu
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Road, Government, Commercial, Residential, Manufacturing (Industrial)
- Location
- Belton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pearl Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Pearl Street, this project includes, but is not limited to, approximately 625 linear feet of curb and gutter, 490 linear feet of laydown curb, 2,885 SY of lime stabilized subgrade and 6 crushed limestone base material, 2,885 square yards of 7 reinforced concrete pavement, transfer of existing water services, SWPPP installations, and traffic control. There is also Add Alternate A which includes, but is not limited to, approximately 1,016 square yards of lime stabilized subgrade and 6 crushed l... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Belton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Government, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
